dina min saithi
Thursday 1 August 2013
Wednesday 31 July 2013
Monday 29 July 2013
DFC TRANSFER AND POSTING
TAMIL NADU GENERATION
AND DISTRIBUTION CORPORATION LIMITED
(SECRETARIAT BRANCH)
144, ANNA SALAI,
CHENNAI-600 002.
Memorandum No.49006/A1/A12/2013-1, dated 29.07.2013
Sub: Establishment - Class I Service - Deputy
Financial Controller –
Transfer and Posting - Orders
- Issued.
*****
Thiru D.Sureshkumar, Deputy Financial
Controller/Chennai Electricity Distribution Circle (West), is transferred and
posted as Deputy Financial Controller/Works, Office of the Chief Financial
Controller/General/Tamil Nadu Generation and Distribution Corporation
Limited/Chennai, in the existing vacancy.
2. He is not eligible for Transfer
Travelling Allowance.
3. A report regarding the date of relief
and date of joining of the official
should be sent to the Tamil Nadu Generation and Distribution Corporation
Limited. This will be apart from the
Certificate of Transfer of Charge.
(BY ORDER OF THE
CHAIRMAN CUM MANAGING DIRECTOR)
S.CHINNARAJALU
SECRETARY
To
Thiru D.Sureshkumar, Deputy Financial Controller/Chennai
EDC. (West)
Through:- The Superintending Engineer/Chennai EDC.
(West)
Copy to:
The Director/Generation/TANGEDCO/Chennai
The Director (Distribution)/TANGEDCO/Chennai
The Inspector General of Police/Vigilance/Chennai
The Legal Adviser/TANGEDCO/Chennai,
The Managing Director/TANTRANSCO/Chennai
The
Director/Projects/TANGEDCO/Chennai
The Director/Transmission Projects/TANTRANSCO/Chennai
The Director/Operation/TANTRANSCO/Chennai,
The Chief Engineers/TANGEDCO/TANTRANSCO
The Director/Finance/TANGEDCO/Chennai.
The Director/Finance/TANTRANSCO/Chennai.
The Chief Financial Controller/General/TANGEDCO/Chennai
The Chief Financial Controller/TANTRANSCO/Chennai.
The Chief Financial Controller/Revenue/TANGEDCO/Chennai
The Chief Financial Controller/Regulatory
Cell/TANGEDCO/Chennai
The Superintending Engineer/Chairman Cum Managing
Director’s Office.
..2..
..2..
..2..
The Superintending Engineer/Chennai EDC. (West)
The General Manager/Human Resource Development/Chennai.
The Superintending Engineer/Computer Centre/Chennai
The Chief Internal Audit Officer
The Deputy Secretary/Personnel/Administration/TANTRANSCO/SB
The Chief Public Relations Officer.
The Under Secretary/Services/Secretariat Branch
The Under Secretary/General/Secretariat Branch
The Private Secretary to Chairman Cum Managing
Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A16, A20, A22, A23 and A25 Sections/Secretariat
Branch
:: TRUE COPY ::
FORWARDED :: BY ORDER ::
SECTION OFFICER
HEAD DRAUGHTSMAN - SUITABILITY CALLED FOR
By
E-Mail
TAMIL NADU GENERATION AND DISTRIBUTION
CORPORATION LTD.
ADMINISTRATIVE BRANCH
From
Er.
A. RAJA, B.E., F.I.E.,
Chief
Engineer/ Personnel,
8th
Floor, NPKRR Maaligai,
144,
Anna Salai,
Chennai
- 600 002.
|
To
The
Superintending Engineer's concerned.
|
Letter
No.054614/348/G3/G31/2013-2, dated 27.07.2013.
Sir,
Sub:
|
Establishment - Class III Service - Senior Draughtsman -
Preparation of panel for promotion to the post of Head Draughtsman -
Suitability Reports - called for -
Regarding.
|
------
|
It
is proposed to prepare a panel of Senior Draughtsman for promotion to the post
of Head Draughtsman for the Crucial date 20.01.2013 to fill up the
existing/future vacancies.
2. I
request you to furnish 5 copies of the Suitability Reports of the Senior
Draughtsman working under your control (List of Names as per Annexure enclosed)
in the FORMAT enclosed, so as to reach this office ON OR BEFORE 16.08.2013 positively. The Letter and FORMAT shall be signed by the
S.E.s/C.E.s himself and not by any other officers. In this connection, I am to invite your
attention to this office Circular Memo. No.068288/Adm.II/A2/97-1, dated
12.06.1997 and request you to keep up the target date.
3. I also request you to furnish specifically
the details regarding the charges/ D.P. (framed/pendency/undergoing punishment)
as on 20.01.2013 alongwith other details.
……2
- 2 -
4. I also request you to furnish the particulars
strictly, as called for in the format.
If any item of the format having no remarks, it should be indicated as
"NIL".
5. If any of the employees as shown in a
particular circle, is not presently working in your circle, a report may be
sent without fail. If he had been
transferred from your circle to other circle, the S.E. concerned may be
addressed, together with the copy of this office reference (w.e.) with request
to furnish the report of the individual concerned directly, to this office.
6. The receipt of this letter with its
enclosures should be acknowledged in the first instance.
Encl.: Annexure & Format.
|
Yours
faithfully,
Sd./- XXX
(R.
MURALI)
Personnel
Officer/ Panel
for
Chief Engineer/ Personnel
|
Copy to the Chief Engineer/ Distribution/
Copy to the Chief Engineer/
Copy to the Assistant Personnel Officer/ M&C/ Adm.
Branch
Copy to G.14 Section.
Copy to Stock file.
ANNEXURE
To the Letter
No.054614/348/G3/G31/2013-2, dated 27.07.2013
List
of names of Senior Draughtsman for Preparation of Panel for promotion to the
post of Head Draughtsman
Sl.
No.
|
Name
of the Senior Draughtsman
|
Date
of Birth
|
Present
Circle
|
(1)
|
(2)
|
(3)
|
(4)
|
1.
|
M.R.
Meera
|
12.12.1957
|
Chennai
EDC/ West
|
2.
|
A.
Amanullah
|
04.05.1960
|
Transmission-II/
Chennai
|
3.
|
A.
Basheer Ahamed Khan
|
29.11.1958
|
Madurai
EDC/ Metro
|
4.
|
K.
Athikesavan
|
15.12.1959
|
Udumalpet
EDC
|
5.
|
S.
Rajendran
|
25.03.1959
|
GCC/
Trichy
|
6.
|
K.N.
Ramanathan
|
08.10.1962
|
M.T.P.S.
|
7.
|
R.
Dilly Ramesh
|
18.02.1959
|
T.T.P.S.
|
8.
|
N.A.
Rafyee
|
30.04.1958
|
P&C/
Coimbatore
|
9.
|
T.
Ramamoorthy
|
15.05.1960
|
GCC-I/
Chennai
|
10.
|
B.
Suthanthiram
|
09.05.1958
|
GCC/
Salem
|
11.
|
V.
Anandan
|
09.02.1961
|
P&C/
Madurai
|
12.
|
P.
Vasanthakumar
|
18.06.1961
|
Kallakurichi
EDC
|
13.
|
A.
Moorthy
|
18.08.1959
|
Gen.
Circle/ Kadamparai
|
14.
|
S.
Venkatraman
|
14.09.1961
|
Salem
EDC
|
15.
|
M.
Sivakumar
|
08.03.1960
|
SE/Civil/ Hydro Project Circle/ Erode
|
16.
|
M.
Paramasivam
|
14.07.1961
|
P&C/
Coimbatore
|
17.
|
G.
Gajendran
|
15.02.1960
|
GCC/
Salem
|
18.
|
T.
Mariappan
|
19.05.1959
|
SE/Civil/ Hydro Project Circle/ Erode
|
19.
|
S.
Martin Devadoss
|
20.04.1961
|
GCC/Trichy
|
20.
|
V.
Dharmarajan
|
08.04.1960
|
T.T.P.S.
|
21.
|
P.
Manoharan
|
04.03.1957
|
SE/Operation/Salem
|
--2
-
2 –
22.
|
R.
Sengodan
|
06.05.1958
|
GCC/Salem
|
23.
|
R.
Nageswaran
|
19.05.1961
|
GCC/Coimbatore
|
24.
|
V.
Ashokan
|
15.07.1956
|
Chennai
EDC/ West
|
25.
|
P.
Chinnadurai
|
05.03.1959
|
E.T.P.S.
|
26.
|
N.
Muralidharan
|
09.06.1959
|
GCC/
Coimbatore
|
27.
|
K.
Jeyakumar
|
05.03.1962
|
SE/Civil/ Hydro Project Circle/ Erode
|
28.
|
R.
Gnanasekaran
|
09.05.1959
|
GCC-I/
Chennai
|
29.
|
T.
Palanivelu
|
04.03.1960
|
Salem
EDC
|
30.
|
B.
Sekar
|
15.01.1960
|
M.T.P.S.
|
31.
|
M.
Kanagasabapathy
|
01.05.1957
|
CE/Disbn./Madurai
Region
|
32.
|
R.
Gajendran
|
30.03.1958
|
Virudhunagar
EDC
|
33.
|
G.
Muniraj
|
15.06.1959
|
GCC/
Madurai
|
34.
|
V.
Essakkimuthu
|
27.06.1962
|
SE/Civil
Hydel/Chennai
|
35.
|
V.
Padmanabhan
|
15.05.1961
|
Madurai
EDC/ Metro
|
36.
|
V.
Kanakasabai
|
14.04.1957
|
E.T.P.S.
|
37.
|
V.
Swaminathan
|
19.06.1961
|
Udumalpet
EDC
|
38.
|
K.
Nagaraj
|
29.12.1959
|
Coimbatore
EDC/ North
|
39.
|
S.
Leelakrishnan
|
04.03.1960
|
GCC/
Salem
|
40.
|
T.
Karuppaiyan
|
01.05.1958
|
Perambalur
EDC
|
41.
|
S.
Prabhakaran
|
07.12.1960
|
GCC-I/
Chennai
|
42.
|
R.
Baskar
|
12.05.1961
|
Namakkal
EDC
|
43.
|
P.
Shaik Alavudeen
|
21.05.1962
|
Civil
Design/ Chennai
|
44.
|
S.
Thiruvengadam
|
07.08.1959
|
Thanjavur
EDC
|
45.
|
M.
Nagalingam
|
09.01.1960
|
SE/P&C/Chennai
|
46.
|
M.
Kannappan
|
12.05.1958
|
SE/MM-II/ Chennai
|
47.
|
N.
Mohan
|
08.06.1959
|
SE/Hydro (Electrical)/Chennai
|
48.
|
R.
Kamaraj
|
17.06.1959
|
Dindigul EDC
|
49.
|
M.
Ragothaman
|
10.05.1958
|
Villupuram EDC
|
--3
-
3 –
50.
|
C.
Krishna
|
13.01.1959
|
NCTPS Stage-II
|
51.
|
A.
Shanmugam
|
19.08.1959
|
Coimbatore EDC/North
|
52.
|
G.
Edward Thodews
|
07.04.1957
|
Nilgiris
EDC
|
53.
|
M.
Lakshmipathi
|
01.05.1960
|
SE/Civil/Hydro Project Circle/ Erode
|
54.
|
S.
Karuppiah
|
14.07.1958
|
SE/APDRP/Chennai
|
55.
|
R.
Loganathan
|
13.04.1961
|
Erode
EDC
|
56.
|
K.
Rajendran
|
10.05.1958
|
ETPS
|
57.
|
A.
Somu
|
01.06.1958
|
GCC/
Madurai
|
58.
|
B.
Nawab John
|
07.02.1961
|
Cuddalore
EDC
|
59.
|
G.
Ramasamy
|
15.03.1959
|
GCC/Madurai
|
60.
|
K.
Subramanian
|
21.01.1960
|
CDC-I/Chennai
|
61.
|
R.
Rajendran
|
18.06.1961
|
Nagai
EDC
|
62.
|
M.
Francies
|
07.04.1962
|
CDC-I/Chennai
|
63.
|
S.
Kalyanasundaram
|
22.08.1959
|
Tiruvannamalai
EDC
|
64.
|
A.
Gunasekaran
|
02.06.1959
|
NCTPS
Stage-I
|
65.
|
P.S.
Venkateswaran
|
21.11.1959
|
GCC/
Madurai
|
66.
|
G.
Subramanian
|
01.12.1959
|
TTPS
|
Sd./-
XXX
PERSONNEL
OFFICER/ PANEL
F
O R M A T
Sl No.
1.
|
Name and Designation
|
:
|
||
2.
|
Age and Date of Birth
|
:
|
||
3.
|
Educational Qualification/ Technical
Qualification
|
:
|
||
4.
|
Date of Regular Appointment in the post of
|
:
|
Assistant Draughtsman Draughtsman
Senior Draughtsman
|
|
5.
|
Whether possess adequate knowledge in
Tamil (Yes or No)
|
:
|
||
6.
|
Total service in the present post as on
20.01.2013
|
|||
7.
|
a)
|
Name of the Station and the circle in
which now working
|
:
|
|
b)
|
The correct and complete office address of
the Senior Draughtsman
|
:
|
||
8.
|
Whether the Senior Draughtsman has
acquired all the qualifications prescribed in the Service Regulation or adhoc
rules for the higher post (Yes/ No)
|
:
|
||
9.
|
Whether any penalty has been imposed
on the Senior Draughtsman for the last
5 years and if so to furnish
|
|||
i)
|
The nature of charge
|
:
|
||
ii)
|
The nature of penalty imposed
|
:
|
||
iii)
|
Identify the charge whether proved or not
proved separately
|
:
|
10.
|
If the punishment ordered is stoppage of Increment
with or without cumulative effect, indicate the following
|
|||
i)
|
the normal due date of Increment of the Senior
Draughtsman
|
:
|
||
ii)
|
the date of commencement of the period of Punishment
|
:
|
||
iii)
|
the probable date of completion of the
period of Punishment.
(A copy of final orders issued to be
enclosed)
|
:
|
||
11.
|
Whether any Charge/Vigilance Enquiry are
pending against Senior Draughtsman and if so indicate the nature of Charge/Enquiry
and its present stage. A copy of Charge memo. to be enclosed.
|
:
|
||
12.
|
Whether he/she is on long leave/
unauthorized absence for more than six months
|
:
|
||
13.
|
Whether suitable for promotion
|
:
|
SUPERINTENDING
ENGINEER
Subscribe to:
Posts (Atom)