TAMIL NADU GENERATION &
DISTRIBUTION CORPORATION LTD.
Administrative Branch
144, Anna Salai,
Chennai - 600
002.
Memo.
No.036079/252/G.3/G.3(1)/2013-4 dated 22.07.2013.
Sub:
|
Establishment - Class II Service - Promotion to the post
of Chief Head Draughtsman from the post of
Head Draughtsman - List of names selected and included in the panel -
Orders - Issued.
|
------
|
Nineteen
(19) names of Head Draughtsman as detailed in the Annexure-I to this memo. are
informed that their names have been approved and included in the panel for
promotion to the post of Chief Head Draughtsman on regular basis under
Regulation 92 of Tamil Nadu Electricity Board Service Regulation.
2.
The names of the Head Draughtsman indicated in the Annexure-II have not been
selected for promotion to the post of Chief Head Draughtsman.
3.
The names of the Head Draughtsman mentioned in the Annexure-II are informed
that any appeal against their non-selection lies with the Chairman-cum-Managing
Director/TANGEDCO which should be preferred within a period of 2 months from
the date of communication of this memo. If no appeal is received within the
said period the approved list communicated (Annexure-I) will be deemed as
final.
4.
They are directed to acknowledge the receipt of this memo.
Encl: Annexure-I &
II
A. RAJA
CHIEF
ENGINEER/ PERSONNEL
To
The Individuals
Through the Superintending Engineers concerned.
--2
- 2 -
Copy to the Superintending Engineers concerned.
Copy to the Chief Engineers concerned.
Copy to the Personnel Officer/Panel/Adm Branch.
Copy to the Assistant Personnel Officer/M&C/Adm Branch.
Copy to the G.14 Section / Adm.Branch
Copy to the G.15 Section / Adm.Branch (2 copies).
Copy to the Stock file
// FORWARDED / BY ORDER //
Sd./- XXX
SUPERINTENDENT
Annexure-I
TO THE MEMO. NO.036079/252/G3/G31/2013-4, DATED
22.07.2013.
SELECTED LIST OF HEAD DRAUGHTSMAN FOR PROMOTION TO THE
POST OF CHIEF HEAD DRAUGHTSMAN
CRUCIAL DATE: 20.04.2013
Sl. No.
|
Name
|
D.O.B.
|
Present
Station
|
1.
|
Sundaramoorthy.
C
|
13.06.1958
|
Thermal
Project/ Chennai-2
|
2.
|
Annal.
P
|
01.09.1956
|
GCC-II/
Chennai
|
3.
|
Kannan.
K
|
21.07.1955
|
Erode
EDC
|
4.
|
Meganathan.
A
|
21.11.1956
|
Nilgiris
EDC
|
5.
|
Ravanan.
S
|
01.04.1958
|
CE/D/Trichy
Region
|
6.
|
Vijayan.
M
|
15.08.1956
|
CE/D/Coimbatore
Region
|
7.
|
Mathineraiselvan.
G
|
03.05.1957
|
Tiruvannamalai
EDC
|
8.
|
Asokan.
G
|
05.09.1957
|
Tiruvannamalai
EDC
|
9.
|
Ramanathan.
V
|
20.05.1961
|
SE/LD & GO/
Chennai-2
|
10.
|
Ravichandran.
S
|
01.07.1961
|
G.M./Mettur W.S.C./ Mettur Dam
|
11.
|
Kamatchi.
S
|
20.06.1956
|
SE/Proj. Dev. &
Co-ordination/ Chennai-2
|
12.
|
Ranganathan.
P
|
25.09.1961
|
Civil Designs & Hydro Projects/
Chennai-2
|
13.
|
Nagarajan.
N
|
14.03.1959
|
GCC-I/
Chennai
|
14.
|
Muthuramalingam.
S
|
23.03.1958
|
Valuthur
GTPS
|
15.
|
Sundaram.
M
|
11.04.1957
|
Ramnad
EDC
|
16.
|
Santhakumaran.
R
|
21.05.1956
|
Gen.
Circle/ Kundah
|
17.
|
Saraswathy.
N.L
|
24.04.1958
|
CDC-I/Chennai
|
18.
|
Mayarajan.
T
|
13.04.1959
|
Gen.
Circle/ Tirunelveli
|
19.
|
Boobalan.
V
|
08.02.1958
|
Thirupathur
EDC
|
P.T.O.
Sd./-
XXX
SUPERINTENDENT
Annexure-II
TO THE MEMO. NO.036079/252/G3/G31/2013-4, DATED
22.07.2013.
NOT SELECTED LIST OF HEAD DRAUGHTSMAN FOR PROMOTION TO
THE POST OF CHIEF HEAD DRAUGHTSMAN
CRUCIAL DATE: 20.04.2013
The
following names of Head Draughtsman are not selected for promotion to the post
of Chief Head Draughtsman for the reason, not having required experience/
Service on the Crucial date (i.e. 20.04.2013) as per Service Regulations.
1.
|
Narasimman.
R
|
10.05.1956
|
SE/
Transmission-II
|
|
|
|
|
2.
|
Athikesavan.
N.K
|
25.06.1958
|
Chennai
EDC/ South
|
|
|
|
|
3.
|
Krishnaswamy.
K
|
01.08.1956
|
Gen. Circle/ Kadamparai
|
|
|
|
|
4.
|
Selvaraj.
A
|
05.03.1958
|
SE/ Civil/ Hydro Project Circle/ Erode
|
|
|
|
|
5.
|
Abdul
Kareem. K.M
|
28.05.1961
|
GCC/
Coimbatore
|
|
|
|
|
6.
|
Subbiah.
A
|
20.02.1961
|
Tirunelveli
EDC
|
|
|
|
|
7.
|
Subramanian.
P.V
|
13.06.1959
|
T.T.P.S.
|
Sd./- XXX
SUPERINTENDENT
No comments:
Post a Comment